737 Max

COMMERCIAL AIRPLANES

landing page - products

Our Products

Our Products

In 2023, the company produced  on average 18,000 parts per month from over 40 different programs, delivering high-quality products to our customers around the world. Our goal is to achieve high quality and 100% on-time delivery for all our products.

737
777
767
787
Our Capabilities

Our Capabilities

gear

Manufacturing

  • Facility approved to manufacture product per BAC 5317-1 through -5 and BAC 5578

Core Fabrication

  • Capable to handle both nomex & fiberglass material

  • Experience to perform septumize, stabilize and potting process. Has an exposure and  knowledge in manufacture using forming core if required

  • Has an exposure and knowledge to manufacture using forming core if required

core
people

Hand Lay up

  • Primary and secondary structures

  • Capable to manufacture panel for flat.curved surfaces and sandwich panels up to 6.2" thickness

  • Optical  laser projection is installed and applicable when necessary

celcius

Autoclave Cure

  • Equipment capable to support cure until 54ft lenght max temp of 410F (210áµ’c) and max pressure of 100psi (7 bar) 

trim

Trimming

  • Available equipment in trimming for both waterjet and 5 Axis to trim until max 45ft length

  • Able to meet trimmed edge roughness below 125Ra and 400 Ra respectively

paint

Paint

  • Experience to perform Primer and Top Coat on multiple profile of surface appearance

repairs

Repair

  • Capable to perform composite repair per D683908 and D6-83909

inspection

Inspection

​

  • Sufficient equipment to perform digital and dimension inspection.

  • Capable to perform OMV for machine verification and PCMM

  • NDI is available for horizontal and vertical ultrasonic inspection

manufacturing

Assembly

  • Capable to perform minor and complex assembly

Manufacturing Processes

Manufacturing Processes
process

Factory Optimization

Factory Optimization

In 2020, the company launched an internal cost saving program called Production System Efficiency (PSE) focusing on Capital Equipment Capacity and Capability, Productivity and Efficiency, Cost Reduction and Quality Improvement, Factory Capacity, Safety, Sustainability and furthering out Lean Culture.


Factory Capacity is inclusive of Manufacturing Space, Product and People Flow. Once awarded a new BCA Assembly work package in 2019, a team consisting of Lean, Production, Quality, Facilities Maintenance and Shipping was formed to enhance the manufacturing space optimization and streamline the flow to create required space for the newly awarded package.  The target was to on-board the new work without using a single additional square foot of factory space.


The team brainstormed, conducted several workshops using 3P approach and simulated various flow and layouts. The team managed to develop assumptions to move on with the factory capacity planning and analysis. The team created free manufacturing space of 61,412 sq ft compared to calculated space requirement of 8,000 sq ft for the BCA Assembly package. The team not only achieved the goal of on-boarding the work packages without utilizing additional factory floor space, but they created significantly more factory square footage for future work.

 

With such an experience and a strong, cohesive team working on continuous elimination of waste and cost-saving initiative, BCM will be well prepared to take up more new business and handle the challenges that may come.  


​